| Sign In | Join Free | My tjskl.org.cn | 
              
  | 
      
Brand Name : ChenMu
Model Number : CM-S23670-A90*120 -28H1
Certification : ROHS,SGS
Place of Origin : Zhejiang,China
MOQ : 500 PCS
Price : Negotiable
Payment Terms : T/T, Western Union, MoneyGram
Supply Ability : 10000pcs/per week
Delivery Time : 3-5 working days
Packaging Details : Cartons
Efficiency : 92%
Material : Optical grade PC
Led light source : LED
Application : Lighting
Usage : for LED lighting
Smd 5050 90*120 Degree Lens 28in1 For Outdoor Led Tunnel Light
Quick detail
| Product Name: | CM-SZ23670-A90*120°-28H1 | Beam Angle: | 90*120°Degree | 
| Efficiency: | 92% | Material: | PC | 
| LED Chips | 5050 | Dimmable: | L236*W70 mm | 
| Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | ||
| Application: | Flood Light,Tunnel Light, Street Light | ||
| Other Light Distribution: | 30°/60°/ 90°/90*120°/T2 /T3/ ect | ||
Description
Specifications
| Product Name: | CM-SZ23670-A90*120°-28H1 | 
| Beam Angle: | 90*120°Degree | 
| Efficiency: | 92% | 
| Material: | PC | 
| LED Chips | 5050 | 
| Size: | L236*W70 mm | 
| Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | 
| Application: | Flood Light,Tunnel Light, Street Light | 
| Other Light Distribution: | 30°/60°/ 90°/90*120°/T2 /T3/ ect | 
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you.  |  		
| Main Maket: | Europe,South America,North America,Asia ect | 
Shipping and Delivery :
Trade Terms:  |  			EXW , FOB , CNF , CIF | 
| Payment Terms: | T/T , PayPal , Western Union, Moneygram | 
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order | 
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc | 
IES

Drawing

Application:

Notices:
FAQ
1) Can I have a sample order?
  
A: Yes, we welcome sample order to test and check quality.
  
Mixed samples are acceptable.
3) What is the lead time?
  
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
| 
                                             | 
                
                        SMD 5050 90x120 Degree Outdoor Light Lens , 28 In 1 Tunnel Light LED Chip Lens Images |